ARENA CONSTRUCTION
APRIL 18:
The bulldozer arrived and the site was prepped.
April 23:
Bill Wilkins and his awesome crew arrived at 9 am and once the building was marked out they began drilling holes
Once the holes were drilled, the posts were set in
By 2:30 they were pouring cement to set the posts
The crew was gone by 3:45.
The building itself will be delivered sometime the week of May 7
May 11: The Building arrived at 11 am
Half of the crew worked to unload the truck, the other half levelled out the posts and got the top brace board up
The arches were assembled and stacked on the ground and then.............
The first arch was hoisted into place
The center bracing and one side bracing were attached and within an hour all the arches were up!!!
The rest of the side bracing was installed
All of a sudden it was time for the cover!!!!
The fabric was rolled out, the pipes slid in place and ropes tied on, then it was ready to pull up and over
UP and OVER
Once it was over, the ends were secured into place
May 16: The crew was back to do the ends.
Posts were set and the doors in either end were framed in with steel and then wood.
The back end cover was lifted up into place first.
Meanwhile the kickboard along the sides was going up
The end tarp is hung first, then tightened
And then, IT WAS FINNISHED!!!!!!!!!!!